385,000.00

Description

Date

1st Batch: 20th – 22nd Jan, 2025

2nd Batch: 2nd – 4th Apr, 2025

3rd Batch: 26th – 28th June, 2025

4th Batch: 22nd – 24th Sept, 2025

Event Details

The workshop is designed to enable generator protection engineers have an in- depth understanding of how to effectively and efficiently operate a power plant and troubleshooting basic maintenance problems associated with power plant operations.

 

CONTENT:

· Stator protection

· Rotor protection

· Generator excitation system

· Governor system / control action

· Field failure (Loss of field)

· Over speed /over frequency protection

· Motoring

· Loss of synchronism

· Bearing over heat

· Boiler logic

· Efficiency and economic operation of generator

· Generator auxiliary systems

· Free systems

· Turbine/compressor systems

· Bearing/shaft systems

 

FOR WHOM:

Works, Services and Maintenance Personnel

 

TRAINING METHODOLOGY

The training methodology combines lectures, discussions, group exercises and illustrations. Participants will gain both theoretical and practical knowledge of the topics. The emphasis is on the practical application of the topics and as a result participant will go back to the workplace with both the ability and the confidence to apply the techniques learned to their duties.

Leave a Reply

Your email address will not be published. Required fields are marked *

Leave a Reply

Your email address will not be published. Required fields are marked *