576,469.00

Category: Tag:

Description

Date:

1st Batch: 29th – 31st Jan, 2026

2nd Batch: 23rd – 25th Apr, 2026

3rd Batch: 16th – 18th July, 2026

4th Batch: 5th – 7th Oct, 2026

Event Details

Participants become familiar with: –

  • Basic characteristics and issues of strategic planning.
  • Space planning and design.
  • Project management.
  • Building operations.
  • Workplace change management.
  • Real estate.
  • Computer-aided facility management systems.

CONTENT

  • Pre-construction services and value engineering.
  • Budgeting
  • Scheduling
  • Design and construction development.
  • Contracting methods (e.g., CM, lump sum, cost plus)
  • Basic Architecture and Mechanical.
  • Contractor qualification and selection.
  • Contract documents.
  • Team building.
  • Construction oversight and change order management.
  • Inspection of work.
  • Project controls.
  • Punch lists.
  • Startup and commissioning.
  • Warranties
  • Cost reporting.
  • And project close-out.

TRAINING METHODOLOGY

The training methodology combines lectures, discussions, group exercises and illustrations. Participants will gain both theoretical and practical knowledge of the topics. The emphasis is on the practical application of the topics and as a result participant will go back to the workplace with both the ability and the confidence to apply the techniques learned to their duties.

Leave a Reply

Your email address will not be published. Required fields are marked *

Leave a Reply

Your email address will not be published. Required fields are marked *