Description
Date:
1st Batch: 16th – 18th Feb, 2026
2nd Batch: 14th – 16th May, 2026
3rd Batch: 17th – 19th Aug, 2026
4th Batch: 26th – 28th Nov, 2026
Event Details
At the end of the training, participants will be able to have:
- Knowledge of building systems and maintenance issues
- The ability to develop a maintenance plan
CONTENT
- Mechanical, electrical, and plumbing systems
- Elevators
- Roofs
- Facades
- Energy and water conservation
- Lighting
- Telecommunications
- Security
- Maintenance and equipment rooms
- Discuss custodial services
- Preventive, corrective, and deferred maintenance
- Warranties
- Purchasing and job specifications
- Mold and mildew control
- Pest control
- Rubbish and recycling
- Lobbies
- Furnishings
- Egress and signage
- Fire safety
- Inspection checklists
- Outside contractors
- Service contracts
- Supplies and equipment.
TRAINING METHODOLOGY
The training methodology combines lectures, discussions, group exercises and illustrations. Participants will gain both theoretical and practical knowledge of the topics. The emphasis is on the practical application of the topics and as a result participant will go back to the workplace with both the ability and the confidence to apply the techniques learned to their duties.




